This week we began installing HVAC ductwork in the attic. After the
walls were framed in the basement, we installed new cast iron drains and
in-filled old basement windows with new block. Next week, we will
begin working in the historical
building.
The Suzuki School of Newton has finally purchased a permanent home for their flourishing music school and preschool. Watch as we grow into our new space!
Friday, September 14, 2018
Friday, September 7, 2018
The renovations have begun!
The Suzuki School of Newton has just begun renovations and we are eager to share the progress with you! Please follow us as we progress through this great journey. We are thrilled to be underway.
Subscribe to:
Posts (Atom)
April showers bring May flowers
As the showers subside the outside of our gorgeous property is starting to bloom. They are getting ready to plant the sod and this wonderfu...
-
This week we cut through to the 80’s Building from the historical Building, placed the heating units in both buildings, and ran the fire p...
-
It's only a matter of time now before we are finally in our new home. Here are the last of the pictures before you get to see it for yo...
-
The window sashes are back on site and are being installed. We have the riser for the sprinkler system going in. The cheek wall at the f...