Friday, October 26, 2018

This week at Suzuki...

The gravel is down for the driveway.  The electrical service is going in, as well as the pad for the heating units.  We were also able to frame up the walls for the new bathroom in the historical building.






Monday, October 22, 2018

Lots of Outside Work

A lot of outside work going on this week.  The bases for the light posts are going in, as well as drainage for different areas.  The cheek wall, to stabilize the rubble foundation, was also completed this week.  






Friday, October 12, 2018

The new home for Suzuki is coming along!

The window sashes are back on site and are being installed.  We have the riser for the sprinkler system going in.  The cheek wall at the foundation is being poured.  And the Brentwood system is in.  Another productive week at Suzuki.





April showers bring May flowers

As the showers subside the outside of our gorgeous property is starting to bloom.  They are getting ready to plant the sod and this wonderfu...