Friday, November 16, 2018

The buildings are now connected!

This week we cut through to the 80’s Building from the historical Building, placed the heating units in both buildings, and ran the fire protection piping.






Friday, November 2, 2018

Working on the outside of the building

The outside is shaping up at Suzuki.  The parking lot is paved.  Window wells are in.  The dangerous set of stairs have been removed.  Light poles are in place.






April showers bring May flowers

As the showers subside the outside of our gorgeous property is starting to bloom.  They are getting ready to plant the sod and this wonderfu...