The Suzuki School of Newton has finally purchased a permanent home for their flourishing music school and preschool. Watch as we grow into our new space!
Friday, November 16, 2018
The buildings are now connected!
This week we cut through to the 80’s Building from the historical
Building, placed the heating units in both buildings, and ran the fire
protection piping.
Friday, November 2, 2018
Working on the outside of the building
The outside is shaping up at Suzuki. The parking lot is paved.
Window wells are in. The dangerous set of stairs have been removed.
Light poles are in place.
Subscribe to:
Posts (Atom)
April showers bring May flowers
As the showers subside the outside of our gorgeous property is starting to bloom. They are getting ready to plant the sod and this wonderfu...
-
This week we cut through to the 80’s Building from the historical Building, placed the heating units in both buildings, and ran the fire p...
-
It's only a matter of time now before we are finally in our new home. Here are the last of the pictures before you get to see it for yo...
-
The window sashes are back on site and are being installed. We have the riser for the sprinkler system going in. The cheek wall at the f...