Good things are happening over at the new location. Drywall is up, the duct work is going in and the snow is holding out so they can keep working outside. Happy holidays and a very happy New Year!
The Suzuki School of Newton has finally purchased a permanent home for their flourishing music school and preschool. Watch as we grow into our new space!
Saturday, December 29, 2018
Progress, Progress, Progress!
A busy week at Suzuki school. Poetry impressions. Wall patching. Fire protection. Heating systems. Timber walls.
Stay tuned for next week as we begin decks/ramps and start hanging drywall.
Thursday, December 13, 2018
The heat is on!
We have temporary heat but now that Eversource has arrived we have power....and in turn we will soon have permanent heat. Bring on the HVAC!
Subscribe to:
Posts (Atom)
April showers bring May flowers
As the showers subside the outside of our gorgeous property is starting to bloom. They are getting ready to plant the sod and this wonderfu...
-
This week we cut through to the 80’s Building from the historical Building, placed the heating units in both buildings, and ran the fire p...
-
It's only a matter of time now before we are finally in our new home. Here are the last of the pictures before you get to see it for yo...
-
The window sashes are back on site and are being installed. We have the riser for the sprinkler system going in. The cheek wall at the f...